Show

Completed · 31 audited sites

Open the full report

What the audits led to

31

Sites audited

16 cities, 13 states

20

Approved or beyond

65% of sites

5

Implemented

5 stalled

Interventions costed

₹2.7–5.6 crore

Sections remember if you fold them.

31 places

Audited sites (31)

Details

Guwahati, Assam · Cohort 1

NH-27 Boragaon (Post-Flyover)

Post-Flyover Highway Corridor

High RiskIn ProgressNHAI
  1. Stage 1, In Audit, complete
  2. Stage 2, Audited, complete
  3. Stage 3, Report Submitted, complete
  4. Stage 4, Approved, complete
  5. Stage 5, In Progress, current5
  6. Stage 6, Implemented6

In Progress · stage 5 of 6

Next: Implemented

Why this location is crash-prone

Dangerous speed transition zone post-flyover on NH-27. Vehicles exit at 70+ km/h. 4 serious accidents in 2023–24.

Audit findings (5)

  • No speed calming downstream of flyover — vehicles exit at 70+ km/h
  • Pedestrian desire lines at NH exits with zero formal crossing
  • Road delineation absent — lane markings completely faded
  • Missing crash barriers on vulnerable embankment segments
  • Illegal roadside activity pulling pedestrians onto NH

Recommended interventions

  • Speed calming sequence: rumble strips + road narrowing post-flyover₹3–8 lakh
  • Pedestrian crossings with refuge islands on NH₹5–12 lakh
  • Full road marking renewal₹2–4 lakh
  • Crash barriers on embankment-side lane₹4–10 lakh
  • Total₹14–34 lakh

Expected impact

40–45% crash reduction. Speed reduction of 20–30 km/h at critical transition zone.

Who is responsible

  • NHAI PIU, Guwahati (NEDFi House, G.S. Road, Dispur)

    Primary

    PRIMARY — All structural and geometric works on NH-27

  • PWD Assam

    State PWD coordination for NH alignment works

  • GMDA

    Development zone approval, ROW coordination

  • GMC

    Local approach roads, footpaths adjacent to NH

  • DC Kamrup Metropolitan / DRSC

    Coordination

Why not yet implemented

NHAI PIU implementation underway. Safety improvement budget allocated.

Audited by

Bihari Genda

Write to NHAISite map