Completed · 31 audited sites

Open the full report

What the audits led to

31

Sites audited

16 cities, 13 states

20

Approved or beyond

65% of sites

5

Implemented

5 stalled

Interventions costed

₹2.7–5.6 crore

Sections remember if you fold them.

31 places

Audited sites (31)

Details

New Delhi, Delhi · Cohort 1

IIT Delhi Outer Ring Road

High-Speed Urban Arterial

High RiskImplementedState PWD
  1. Stage 1, In Audit, complete
  2. Stage 2, Audited, complete
  3. Stage 3, Report Submitted, complete
  4. Stage 4, Approved, complete
  5. Stage 5, In Progress, complete
  6. Stage 6, Implemented, current6

Implemented · stage 6 of 6

Why this location is crash-prone

Multiple fatal crashes in 2024 and 2025, including a fatal crash in June 2025 and a fatal truck–pedestrian crash in August 2024.

Audit findings (5)

  • Discontinuous broken footpaths forcing pedestrians onto high-speed carriageway
  • Chronic waterlogging after light rain — pushes pedestrians into traffic
  • Two-wheeler encroachment on footpaths during peak hours
  • Parked vehicles occupying walkway widths near IIT gates
  • No speed calming on long straight segments enabling 70+ km/h

Recommended interventions

  • Continuous Accessible Pedestrian Corridor (CAPC) — 1.8m min width₹15–25 lakh
  • Drainage upgrade — gully pots, trench drains at ponding sites₹5–10 lakh
  • Bollards to prevent two-wheeler footpath encroachment₹2–4 lakh
  • Speed feedback LED boards + camera enforcement₹5–12 lakh
  • Total₹27–51 lakh

Expected impact

30–40% pedestrian crash reduction. 60–70% reduction in waterlogging incidents.

Who is responsible

  • PWD Delhi

    Primary

    PRIMARY — responsible authority named in the implementation status report

  • PWD Delhi (Roads)

    PRIMARY — ORR is Delhi PWD arterial; footpaths, drainage, markings

  • Delhi Traffic Police

    Signal management, speed cameras, enforcement

  • MCD

    Local connecting roads, drainage

  • Delhi Jal Board

    Stormwater drains — chronic waterlogging

  • DM South Delhi / DRSC

    Coordination

Progress record

  1. Implemented

    11 Nov 2026

    PWD built a continuous pedestrian corridor, upgraded drainage, installed bollards and speed feedback boards with camera enforcement. Sign boards installed, footpath maintained, traffic police deployed, waterlogging addressed. (Implementation status report, Cohort 1.)