Project Rakshak: road safety audits across India

Loading the map…

Crashfree India

Project Rakshak

Crashfree India

Project Rakshak

Show

Completed · 31 audited sites

Open the full report

What the audits led to

31

Sites audited

16 cities, 13 states

20

Approved or beyond

65% of sites

5

Implemented

5 stalled

Interventions costed

₹2.7–5.6 crore

Sections remember if you fold them.

31 places

Audited sites (31)

Details

Guwahati, Assam · Cohort 1

AEC Road Turn, Jalukbari

NH Junction, Campus Proximity

High RiskApprovedNHAI
  1. Stage 1, In Audit, complete
  2. Stage 2, Audited, complete
  3. Stage 3, Report Submitted, complete
  4. Stage 4, Approved, current4
  5. Stage 5, In Progress5
  6. Stage 6, Implemented6

Approved · stage 4 of 6

Next: In Progress

Why this location is crash-prone

Fatal crashes involving students documented at this NH-27 junction near Assam Engineering College.

Audit findings (4)

  • Vehicles turning at high speed from NH — no speed calming
  • Student pedestrian flows crossing NH without formal crossing
  • Poor sight distance due to roadside encroachment
  • Night-time visibility critically low

Recommended interventions

  • Junction redesign — dedicated turn lane with deceleration taper₹8–15 lakh
  • Pedestrian crossing with refuge island on NH₹4–8 lakh
  • Speed calming: rumble strips 100m before junction₹2–4 lakh
  • LED lighting on approach and junction₹2–4 lakh
  • Total₹16–31 lakh

Expected impact

35–40% crash reduction. Student pedestrian fatality risk reduced 50%+.

Who is responsible

  • NHAI PIU, Guwahati

    Primary

    PRIMARY if on NH-27 corridor

  • Assam PWD

    Primary if state-managed — mixed jurisdiction

  • DC Kamrup Metropolitan / DRSC

    Coordination

Why not yet implemented

In-principle approval from GMDA. NHAI PIU Guwahati acknowledged. Jurisdiction confirmation pending.

Audited by

Tratah