Project Rakshak: road safety audits across India

Loading the map…

Crashfree India

Project Rakshak

Crashfree India

Project Rakshak

Show

The teams

102

Teams

230 students

37

Institutions

21

States and territories

86

On the map

16 not placed yet

What the audits led to

31

Sites audited

16 cities, 13 states

20

Approved or beyond

65% of sites

5

Implemented

5 stalled

Interventions costed

₹2.7–5.6 crore

Cohort by cohort

Sections remember if you fold them.

133 places

Audited sites (31)

Team blackspots (102)

Details

Kozhikode, Kerala · Cohort 1

Kunnamangalam Junction

Y-Junction on NH 766

High RiskIn ProgressState PWD
  1. Stage 1, In Audit, complete
  2. Stage 2, Audited, complete
  3. Stage 3, Report Submitted, complete
  4. Stage 4, Approved, complete
  5. Stage 5, In Progress, current5
  6. Stage 6, Implemented6

In Progress · stage 5 of 6

Next: Implemented

Why this location is crash-prone

37 fatal and grievous crashes recorded (2016–2018).

Audit findings (5)

  • Y-junction geometry creates severe sight-line restrictions on all 3 arms
  • No pedestrian crossing infrastructure or refuge islands at any approach
  • Absent traffic signals — uncontrolled merge point
  • Street lighting inadequate for evening pedestrian movement
  • High vehicle speeds on NH incompatible with Y-junction design

Recommended interventions

  • Mini-roundabout / channelized Y-junction redesign₹8–15 lakh
  • Pedestrian refuge islands + marked crossings (3 arms)₹3–5 lakh
  • Traffic signals on all approach arms₹5–10 lakh
  • Rumble strips on NH 766 approach₹1–2 lakh
  • LED street lighting upgrade₹2–4 lakh
  • Total₹19–36 lakh

Expected impact

Estimated 35–40% crash reduction. 50%+ reduction in pedestrian fatality risk.

Who is responsible

  • PWD, National Highway Division, Kozhikode

    Primary

    PRIMARY — responsible authority named in the implementation status report

  • PWD NH Division, Kozhikode (EE Sujeesh K V)

    PRIMARY — Geometric redesign, markings, signals on NH 766

  • Kozhikode Traffic Police

    Signal installation, timing, enforcement

  • Kozhikode City Corporation

    Footpaths, pedestrian refuge islands, drainage

  • KRSA

    State-level blackspot coordination

  • DC Kozhikode / DRSC

    Multi-agency coordination (MV Act 2019 S.215B)

Why not yet implemented

PWD NH Division has done reflective studs, pothole repair, zebra crossings, signage and tree clearance. Line markings, crossings and rumble strips are being added to ongoing works; damaged footpath blocks will be reinstated; berm concrete is under way. New footpath awaits funds. A DPR for the NH 766 Malaparambu–Puduppadi upgrade (including a possible Kunnamangalam bypass) is being prepared.

Progress record

  1. In Progress

    11 Nov 2026

    Reported as fully implemented, but berm concrete is still under way and the new footpath awaits funds; shown as In Progress until confirmed. (Implementation status report, Cohort 1.)

Audited by

CrashZero

Write to State PWDSite map