Project Rakshak: road safety audits across India

Loading the map…

Crashfree India

Project Rakshak

Crashfree India

Project Rakshak

Show

The teams

102

Teams

230 students

37

Institutions

21

States and territories

86

On the map

16 not placed yet

What the audits led to

31

Sites audited

16 cities, 13 states

20

Approved or beyond

65% of sites

5

Implemented

5 stalled

Interventions costed

₹2.7–5.6 crore

Cohort by cohort

Sections remember if you fold them.

133 places

Audited sites (31)

Team blackspots (102)

Details

Kozhikode, Kerala · Cohort 1

Chevayur Junction

Urban T-Junction

Medium RiskIn ProgressState PWD
  1. Stage 1, In Audit, complete
  2. Stage 2, Audited, complete
  3. Stage 3, Report Submitted, complete
  4. Stage 4, Approved, complete
  5. Stage 5, In Progress, current5
  6. Stage 6, Implemented6

In Progress · stage 5 of 6

Next: Implemented

Why this location is crash-prone

Frequent crashes; 60% resulted in grievous injuries (2023 FIR data).

Audit findings (4)

  • No pedestrian crossing on minor road approach
  • Signal timing excludes pedestrian phase
  • Footpaths broken on 2 of 3 approaches
  • Auto-rickshaw encroachment at junction corners

Recommended interventions

  • Pedestrian crossings with countdown signals₹4–8 lakh
  • Signal phase retiming with pedestrian phase₹1–2 lakh
  • Footpath repair on approaches₹2–4 lakh
  • Total₹7–14 lakh

Expected impact

25–30% crash reduction. Pedestrian fatality risk reduced ~40%.

Who is responsible

  • PWD

    Primary

    PRIMARY — responsible authority named in the implementation status report

  • Kerala PWD (R&B Division, Kozhikode)

    PRIMARY if on state road

  • Kozhikode City Corporation

    Footpaths, drainage

  • Kozhikode Traffic Police

    Signal timing, enforcement

  • DC Kozhikode / DRSC

    Coordination

Why not yet implemented

Partially implemented. Raised footpaths built; Neythukulangara Road traffic diverted past the Medical College campus school; traffic personnel and patrols at peak hours; vendors served encroachment notices. Road widening and signals recommended to PWD Roads, Kozhikode South; a six-lane widening with signalised intersections is under government consideration.

Progress record

  1. In Progress

    11 Nov 2026

    Raised footpaths built, traffic diverted, peak-hour policing in place. Widening and signals recommended; street lights and lane markings requested. (Implementation status report, Cohort 1.)

Audited by

Civillians AKA

Write to State PWDSite map