Project Rakshak: road safety audits across India

Loading the map…

Crashfree India

Project Rakshak

Crashfree India

Project Rakshak

Show

The teams

102

Teams

230 students

37

Institutions

21

States and territories

86

On the map

16 not placed yet

What the audits led to

31

Sites audited

16 cities, 13 states

20

Approved or beyond

65% of sites

5

Implemented

5 stalled

Interventions costed

₹2.7–5.6 crore

Cohort by cohort

Sections remember if you fold them.

133 places

Audited sites (31)

Team blackspots (102)

Details

Varanasi, Uttar Pradesh · Cohort 1

Gilat Bazar, Shivpur

Urban Commercial Corridor

Medium RiskIn ProgressState PWD
  1. Stage 1, In Audit, complete
  2. Stage 2, Audited, complete
  3. Stage 3, Report Submitted, complete
  4. Stage 4, Approved, complete
  5. Stage 5, In Progress, current5
  6. Stage 6, Implemented6

In Progress · stage 5 of 6

Next: Implemented

Why this location is crash-prone

Highest casualty count (fatalities and injuries) in the Shivpur region. A single multi-vehicle incident recorded 28 injuries.

Audit findings (4)

  • No speed management — vehicles at 40–50 km/h in busy market
  • Pedestrian crossings absent
  • Footpaths fully encroached by vendors
  • Road markings absent

Recommended interventions

  • Speed management: rumble strips at bazar entry/exit₹1–3 lakh
  • Pedestrian crossings at 3 key points₹2–4 lakh
  • Vendor management: demarcated hawker spaces₹1–2 lakh
  • Total₹4–9 lakh

Expected impact

20–25% crash reduction. Near-miss incidents fall 40%+.

Who is responsible

  • Lok Nirman Vibhag (PWD), Varanasi

    Primary

    PRIMARY — responsible authority named in the implementation status report

  • VNN (Varanasi Nagar Nigam)

    PRIMARY — City road, footpaths, drainage

  • Varanasi Traffic Police

    Speed enforcement

  • DM Varanasi / DRSC

    Coordination

Why not yet implemented

Partially implemented. Pothole repair near St. Atulanand Convent School done; road marking near Harhua Flyover due within a week. PWD says no zebra crossing is needed at Vishal Mega Mart (no median opening). Encroachment under the flyover is for the Municipal Corporation's anti-encroachment team.

Progress record

  1. In Progress

    11 Nov 2026

    Pothole repair done; road marking near Harhua Flyover due within a week. (Implementation status report, Cohort 1.)

Audited by

FTW

Write to State PWDSite map