Skip the map, go to the list

Project Rakshak: road safety audits across India

Loading the map…

Crashfree India

Project Rakshak

Crashfree India

Project Rakshak

Show

The teams

102

Teams

230 students

37

Institutions

21

States and territories

86

On the map

16 not placed yet

What the audits led to

31

Sites audited

16 cities, 13 states

20

Approved or beyond

65% of sites

5

Implemented

5 stalled

Interventions costed

₹2.7–5.6 crore

Cohort by cohort

Sections remember if you fold them.

133 places

Audited sites (31)

Team blackspots (102)

Details

Team blackspot · Rakshak 2026

Team Rakshak Varanasi

Indian Institute of Technology (BHU) Varanasi

Varanasi, Uttar Pradesh

Evidence submitted

Evidence submitted

Phase 1 evidence has been sent and is with the mentor or under review.

A team's blackspot becomes an audited site, with findings, costed fixes and the authority to write to, once its report is reviewed.

The blackspot

Rohaniya, Mohansarai

State: Uttar Pradesh

From the institute
15 km
Location
25.27367, 82.87668

Recorded in the Rakshak portal.

The team

Team
Team Rakshak Varanasi
Students
2
Institution
Indian Institute of Technology (BHU) Varanasi
Based in
Varanasi, Uttar Pradesh
Team code
Team 025

The programme calendar

  1. P1 · Problem Identification & Evidence Building

    Closed

    9 Sept 2026 to 28 Sept 2026

  2. P2 · Stakeholder Surveys & Road Audit

    Closed

    28 Sept 2026 to 19 Oct 2026

  3. P3 · Case Study Analysis & Solution Development

    Closed

    19 Oct 2026 to 2 Nov 2026

  4. P4 · Final Report & Authority Presentations

    Closed

    2 Nov 2026 to 16 Nov 2026