COHORT REPORT

Rakshak 2026
cohort report.

Cohort 2 · Running · 9 Sept 2026 to 15 Dec 2026. Figures as of 4 Oct 2026. Source: Rakshak portal cohort report, generated 4 Oct 2026.

Teams are auditing now. Each point is a blackspot a team is studying; it becomes an audited site once its report is reviewed.

Open on the map

AT A GLANCE

The cohort in numbers.

102

Teams

230

Students

37

Institutions

Spelling variants merged

21

States and territories

86

Blackspots on the map

16 not placed yet

PROGRAMME

Four phases, to scale.

  1. P1

    Closed

    Problem Identification & Evidence Building

    9 Sept 2026 to 28 Sept 2026

  2. P2

    Closed

    Stakeholder Surveys & Road Audit

    28 Sept 2026 to 19 Oct 2026

  3. P3

    Closed

    Case Study Analysis & Solution Development

    19 Oct 2026 to 2 Nov 2026

  4. P4

    Closed

    Final Report & Authority Presentations

    2 Nov 2026 to 16 Nov 2026

Where teams stand on Phase 1

  • Evidence approved16
  • Evidence submitted50
  • Working on it36

WHERE

21 states and territories.

  • Madhya Pradesh16
  • Andhra Pradesh15
  • Uttar Pradesh12
  • Delhi9
  • Telangana7
  • Assam5
  • Maharashtra5
  • Gujarat4
  • Himachal Pradesh4
  • Rajasthan4
  • West Bengal4
  • Jammu and Kashmir3
  • Punjab3
  • Karnataka2
  • Tamil Nadu2
  • Uttarakhand2
  • Arunachal Pradesh1
  • Chandigarh1
  • Haryana1
  • Jharkhand1
  • Kerala1

WHO

37 institutions.

TEAMS

Every team.

Search, filter and sort; the download matches what you see. Select a team to open it on the map.

Showing 25 of 102 teams

BlackspotLocation
001Team AegisKharagpurIndian Institute of Technology KharagpurWest Bengal1Working on itDharma–Keranichoti,Between Dharma and Keranichoti Bus StoppagesNot placed
002Team Apex AuditorsBhopalNational Institute of Technology BhopalMadhya Pradesh3Evidence approvedKamla Nagar – Bhadbhada SquareConfirmed
003Team Arun PathdarshiJote/ItanagarNational Institute of Technology Arunachal PradeshArunachal Pradesh3Working on itNot recordedConfirmed
004Team Beyond LanesSonipatGateway College of Architecture and DesignDelhi4Evidence submittedBahalgarh Chowk,underpassConfirmed
005Team CatalystBhopalSchool of Planning and Architecture, BhopalMadhya Pradesh2Working on itNishatpura – Karond SquareConfirmed
006Team ConnectVaranasiIndian Institute of Technology (BHU) VaranasiUttar Pradesh3Working on itRamnagar PAC / Durga Mandir Tiraha areaConfirmed
007Team Crude MobilityUjjainSchool of Planning and Architecture, DelhiMadhya Pradesh2Working on itSamudra Manthan Square – NanakhedaNot placed
008Team DimensionlessIndoreIndian Institute of Technology IndoreMadhya Pradesh3Evidence submittedIndore-Khandwa Road, Bheru GhatConfirmed
009Team DominatorVaranasiIndian Institute of Technology (BHU) VaranasiUttar Pradesh1Evidence submittedAkhari Bypass Junction, Chitaipur–Chunar RoadConfirmed
010Team DriftJodhpurIndian Institute of Technology JodhpurRajasthan3Evidence submittedRamzan Hatta To Pillar Balaji,NH-112Not placed
011Team EliteLucknowBabasaheb Bhimrao Ambedkar UniversityUttar Pradesh3Working on itRegnant hotel in Niralanagar (consider 500m stretch)Confirmed
012Team Flow MakersIndoreAcropolis Institute of Technology and Research (AITR)Madhya Pradesh3Evidence approvedTeen Imli ChaurahaConfirmed
013Team GreenovaPuneCOEP Technological University, PuneMaharashtra1Evidence approvedMutha river BrigeConfirmed
014Team Hail MaryGuwahatiIndian Institute of Technology GuwahatiAssam2Working on itSomnath Mandir — StretchNot placed
015Team KawachChennaiIndian Institute of Technology MadrasTamil Nadu2Working on itGandhi Mandapam Road × Sardar Patel Road JunctionConfirmed
016Team Kshitij 2.OPuneCOEP Technological University, PuneMaharashtra2Evidence submittedMai Mangeshkar HospitalConfirmed
017Team Life LaneVaranasiIndian Institute of Technology (BHU) VaranasiUttar Pradesh1Evidence submittedGilat Bazar–Shivpur, VaranasiConfirmed
018Team Margrakshak GuwahatiGuwahatiIndian Institute of Technology GuwahatiAssam2Evidence submittedBidyanagar — Stretch: Satmile (0.8 Km) to By Pass 1 (1.3 Km)Confirmed
019Team MinionsVaranasiIndian Institute of Technology (BHU) VaranasiUttar Pradesh2Working on itManduadih ChaurahaNot placed
020Team Neem CorridorChennaiSan Academy of ArchitectureTamil Nadu1Evidence submittedAnna Nagar 2nd Avenue near Anna nagar tower metro station,nearby bluestar junctionConfirmed
021Team Planners of SPABhopalSchool of Planning and Architecture, BhopalMadhya Pradesh2Evidence submittedTT Nagar (Platinum Plaza/Atal Path)Confirmed
022Team PravahDurgapurNational Institute of Technology DurgapurWest Bengal4Evidence approvedBhiringi More NH-19 chainage in Km 494.4–494.6Confirmed
023Team RachanaKopargaonPravara Rural CollegeMaharashtra1Working on itKatkade Petrol Pump, Vaijapur RoadNot placed
024Team RakshaBhopalNational Institute of Technology BhopalMadhya Pradesh4Working on itBairagarh – Chanchal SquareConfirmed
025Team Rakshak VaranasiVaranasiIndian Institute of Technology (BHU) VaranasiUttar Pradesh2Evidence submittedRohaniya, MohansaraiConfirmed

IN PICTURES

The work, seen.

  • Team Roadsense

  • Team Eagle

  • Team Road Safety Pune

  • Team RakshNetra

  • Team Beyond the Horizon

  • Team Spot2Safe

  • Team Zenith

  • Team Flow Makers

  • Team SURAKSHAK

  • Team LEO

  • Team Planners of SPA

  • Team Apex Auditors

ABOUT THESE FIGURES

How to read this report.

  • Every number is computed from the records, so it changes when the data does. Nothing here is typed in by hand.
  • An institution spelled several ways in the portal is counted once. A pin is confirmed when the portal or an administrator set it, and approximate when it was found from the written site name and has not been checked.
  • A team's blackspot becomes an audited site, with findings and costed fixes, only after its report is reviewed.
  • Names of students, mentors and coordinators are not published.